Office Building BRD GSG

Office Building BRD GSG
  • BR Type of construction: Office building
Office Building BRD GSG Office Building BRD GSG
  • BL BR Completion year: 2002
  • Gross surface area: 35.500 sqm
  • Levels above ground floor: 24
  • Basement levels: 3
  • Construction costs: 4.635.000 €

In order to build one of the largest office buildings in Bucharest, the French group Vinci has chosen the company SC ACMS SA as the subcontractor in charge with the execution of the reinforced concrete structure.

The special location of the building in Victoriei Square, its structure of 3B+GF+23F and its developed surface of no less than 60.000 mp requested and proved at the same time the ability to coordinate complex projects and observe the standards of international hotel chains of the specialized staff of SC ACMS SA.

The 10 months execution term of the structure works may be considered as a real record.